Transportation & Installation

 

 

• No use of expensive installation vessels; towing out by tug-boat only

• Large weather window: transportation (Hs 3m) and installation (Hs 2m) max 1 installation day needed

• Small crew needed as all components pre-assembled at yard

• Use of detachable stabilizers (ø10x15m)* during transportation and installation only

• No use of divers

• No hammering or piling

 

 

 

Maintenance

 

• Inspective and preventive maintenance within the wind turbine sequence

• Return shipment for major repair

 

Decommissioning

 

• Complete decommissioning as a reversed installation

   and transportation process, this includes removal of anchors.

 

Asset Management

 

A state of the art Asset Management Control tool with integrated Engineering Document and Management Control systems is part of Blue H Engineering systems.

 